Tool lifecyle is covered in greater detail in the ISTQB Advanced Level Test Manager study material, under managing software testing tool lifecycle.
]]>Which of the following is NOT a goal of a Pilot Project for tool evaluation? [K1]
a) To evaluate how the tool fits with existing processes and practices.
b) To determine use, management, storage, and maintenance of the tool and test assets.
c) To assess whether the benefits will be achieved at reasonable cost.
d) To reduce the defect rate in the Pilot Project.
The ‘Next Topic’ link is pointing to the topic “What is Test analysis / Test Basis? or How to identify the test conditions?”
Considering the sequence of ISTQB Foundation Level syllabus, I’m not sure if this should be the next screen.
]]>You may be missing one topic from syllabus which is Introducing a tool in organization.
]]>